Haringey landlord licensing in 2026
Last updated 22 November 2026, from the council's own page. Not legal advice; the council decides.
Haringey runs additional HMO licensing and selective licensing, on top of the national mandatory HMO licence. The areas, dates and fees below are as the council publishes them, read on 21 November 2026.
Additional HMO licensing in Haringey
- Area: The whole borough, every HMO including section 257 converted buildings.
- Dates: from 17 June 2024, until 16 June 2029.
- Fee as the council publishes it: £1,411.68 in two parts, Part A £641.48, Part B £770.20.
Selective licensing in Haringey
- Area: Wards in the east and centre of the borough, homes let to a single household or two unrelated sharers.
- Wards: Bounds Green, Bruce Castle, Harringay, Hermitage and Gardens, Noel Park, Northumberland Park, Seven Sisters, South Tottenham, St Ann's, Tottenham Central, Tottenham Hale, West Green, White Hart Lane, Woodside.
- Dates: from 17 November 2022, until 16 November 2027.
- Fee as the council publishes it: £705.84 for the five year scheme (Part A £411.57, Part B £294.27).
What the council page says
The council text says thirteen wards while its fee page lists fourteen names. All fourteen are matched here.
How to apply for a Haringey licence
- The selective licensing scheme came into force on 17 November 2022 and runs for 5 years. It covers privately rented homes let to a single person, 2 people or a single household in the council's fourteen listed wards, and you apply online through the council's licensing portal.
- For HMOs, the additional scheme means any HMO in the borough, including Section 257 HMOs, needs a licence. Incomplete applications are refused and withdrawn, and the council requires a gas certificate, electrical safety certificate, floor plan and Energy Performance Certificate.
- The council aims to process selective applications within 90 days, and says this may take longer in the scheme's first year. A non UK resident is only considered if a UK managing agent signs a declaration.
Haringey licence fees and how to pay
- A selective licence costs £705.84 for the 5 year scheme, in two parts. Part A is £411.57, due when you apply. Part B is £294.27, due once the application is approved, and no licence is issued while Part B is outstanding.
- An HMO licence costs £1,411.68 in total. £641.48 is paid on application and £770.20 is taken before the licence is issued. The council says a refused application is not refunded.
Haringey licence fee discounts
- For selective licences, an accredited landlord (for example through LLAS, NRLA or UKALA, or a member of ARLA, RICS or Safeagent) gets £50 off Part B, and a property with an EPC rating of C or above gets £50 off Part B. These can be combined.
- An owner or manager of 3 or more rented flats in the same block gets £75.00 off Part A for the second, third and later flats. The full rate is charged for the first flat, and you must contact the licensing team before submitting so an offline payment can be arranged.
Haringey Article 4 and HMO planning rules
- The council points landlords to its Article 4 Directions page and says an HMO licence does not give planning permission. You may need planning permission to convert a building to an HMO or change a family house to an HMO.
- Where use is unauthorised, the council grants a licence with a shorter term, usually 1 year, and expects the breach to be fixed within that period.
Haringey council licensing contact
- The private sector housing team can be reached at propertylicensing@haringey.gov.uk or on 020 8489 5521.
From Haringey council's page, read 22 November 2026.
The mandatory HMO licence in Haringey
Anywhere in England, a home with five or more people from two or more households who share a kitchen, bathroom or toilet needs a mandatory HMO licence from the council. The mandatory HMO licence, and what counts as a household.
Haringey's public licence register
Search by postcode or address on the council's site, opened 21 November 2026. Registers for every council.
Fines Haringey has published
- 20 January 2026: Additional licence HMO not licensed, unsafe conditions. £10,000 for the managing agent (upheld at tribunal) and £2,500 for the owner. Civil penalty. Council page
- 14 July 2025: HMO not licensed. £23,500, paid at £19,975 after the early payment discount. Civil penalty. Council page
- 2 July 2025: Selective licence home not licensed, with harassment and poor conditions. £10,000. Civil penalty. Council page
Fines other councils have published.
What letting without a licence can cost
An unlimited fine in court, or a civil penalty of up to £40,000 per offence, and tenants can claim up to two years of rent back. HMO fines and penalties.
Questions landlords ask about Haringey
Does Haringey have selective licensing?
Yes. Wards in the east and centre of the borough, homes let to a single household or two unrelated sharers. Read on the council's page on 21 November 2026.
Does Haringey have additional HMO licensing?
Yes. The whole borough, every HMO including section 257 converted buildings. Read on the council's page on 21 November 2026.
How much is a landlord licence in Haringey?
Additional HMO licensing: £1,411.68 in two parts, Part A £641.48, Part B £770.20. Selective licensing: £705.84 for the five year scheme (Part A £411.57, Part B £294.27). These are the council's own figures as read on 21 November 2026; its fee page is the one to trust.
How do I apply for a Haringey landlord licence?
The selective licensing scheme came into force on 17 November 2022 and runs for 5 years. It covers privately rented homes let to a single person, 2 people or a single household in the council's fourteen listed wards, and you apply online through the council's licensing portal. For HMOs, the additional scheme means any HMO in the borough, including Section 257 HMOs, needs a licence. Incomplete applications are refused and withdrawn, and the council requires a gas certificate, electrical safety certificate, floor plan and Energy Performance Certificate. From the council's page, read 22 November 2026.
When does Haringey landlord licensing start and end?
Additional HMO licensing: from 17 June 2024 until 16 June 2029. Selective licensing: from 17 November 2022 until 16 November 2027.
Where is Haringey's public licence register?
Search by postcode or address on the council's site, linked on this page. Every council must keep one under section 232 of the Housing Act 2004.
Similar councils with a licensing scheme
Sources
- Haringey council, its licensing page, read 21 November 2026
- Housing Act 2004